ข้ามไปยังเนื้อหาหลัก

Nepal Flood Toll Reaches 903 With 4,247 Still Missing

อ่านข่าวนี้บน The State of Israel

Courtroom-sketch editorial illustration of the Trishuli River downstream in Nepal from a May 2025 sunset photograph; archival river-basin context, not the Rasuwa flood site or the reported disaster.
AI courtroom sketch of the Trishuli River downstream in Nepal from a May 2025 sunset photograph; archival river-basin context, not the Rasuwa flood site or the reported disaster. Adapted from the credited reference. Light from sun striking on river.jpgPudasaini07; CC0.

Nepal's National Disaster Risk Reduction and Management Authority said 903 bodies had been recovered and 4,247 people remained missing after the Bhotekoshi flood as of 9 a.m. on August 31. It reported 10,451 people rescued and 267 injured, including 156 who had been discharged. The missing included 592 foreign nationals, 127 Nepalis traveling with foreigners, 83 security personnel and 933 people linked to hydropower projects. The flood began on August 26, and authorities said 20,819 security personnel and six surgical teams were supporting the response.

แหล่งข้อมูล

แหล่งข้อมูลปฐมภูมิ:1

เรื่องที่เกี่ยวข้อง

  1. Nepal Disaster Agency Raises Bhotekoshi Flood Toll to 1,050
  2. Nepal-Tibet Flood Toll Rises to 750 With 3,044 Missing
  3. Nepal Flood Body-Recovery Count Rises to 669
  4. Nepal Police Raise Rasuwa Flood Death Toll to 389
  5. Nepal Police Confirm 95 Dead in Bhotekoshi Flash Flood

เกิดข้อผิดพลาด

เราไม่สามารถดำเนินการดังกล่าวได้ โปรดตรวจสอบการเชื่อมต่อของคุณแล้วลองใหม่อีกครั้ง