ข้ามไปยังเนื้อหาหลัก

France Clears EDF to Begin Site Preparation for Two EPR2 Reactors at Gravelines

อ่านข่าวนี้บน The State of Israel

Courtroom-sketch editorial illustration of electricity transmission supports and conductors from a May 2010 photograph; archival energy-infrastructure context, not the project, local equipment, outage or storm reported.
AI courtroom sketch of electricity transmission supports and conductors from a May 2010 photograph; archival energy-infrastructure context, not the project, local equipment, outage or storm reported. Adapted from the credited reference. Anchor pylon of high-voltage overhead power line 750 kV.jpgNovoklimov; CC0.

A decree published in France's Journal Officiel on August 22 grants EDF the environmental authorization to begin preparing the Gravelines nuclear plant in Nord for two new EPR2 reactors. The authorized works include site platforms, earthworks, soil reinforcement, relocating the plant's rail terminal, a watertight enclosure beneath the future reactor buildings, and an intake channel, mainly in Gravelines and Loon-Plage. Signed by Prime Minister Sébastien Lecornu and two ministers, the decree is not the license to create the reactors themselves. The two 1,600 megawatt units belong to the six-reactor EPR2 program announced in February 2022, with the first pair at Penly targeted for service around 2038.

แหล่งข้อมูล

แหล่งข้อมูลทุติยภูมิ:1234

เรื่องที่เกี่ยวข้อง

  1. EU Approves €6.1 Billion for Ukraine Air and Missile Defenses
  2. Putin Decree Lets Russia Take Control of Infrastructure Vulnerable to Drone Attacks
  3. UK Allows SCALP Missile Data Release for Assembly Lines in Ukraine
  4. Humanoid Robots Beat Human 100m, High Jump and 400m World Records in Beijing
  5. UK Launches £28 Million Ultra-Long-Duration Energy Storage Challenge

เกิดข้อผิดพลาด

เราไม่สามารถดำเนินการดังกล่าวได้ โปรดตรวจสอบการเชื่อมต่อของคุณแล้วลองใหม่อีกครั้ง